When you need it
- Before commissioning new equipment
- Periodic checks of breakers and disconnectors
- After cable laying and repair
- When insulation condition is in doubt
- Substation acceptance
Technical details
- Methods
- GOST 1516.3-96, GOST 24606.3-82, GOST 34834-2022
- Objects
- circuit breakers, disconnectors, cables, switchgear
- Measured
- test voltage (kV), contact resistance (μΩ)
- Result
- official test report
- Accreditation
- AZS ISO/IEC 17025:2020 No. AZ 01.0084.01.26
How we do it
High-voltage testing
01
Preparation
Equipment is disconnected and safety measures are applied.
02
Test
Insulation is tested with elevated voltage for a set time.
03
Contact resistance
Contact resistance of breakers and disconnectors is measured.
04
Report
Results are compared with the norm and reported.
FAQ
FAQ
Why do high-voltage testing?
To find hidden insulation defects before operation and prevent failures.
What equipment do you test?
Circuit breakers and disconnectors, cables, switchgear and transformer insulation.
Why measure contact resistance?
High contact resistance causes contacts to overheat and equipment to fail.
Do you issue a document?
Yes, a report from an accredited laboratory.

Request a measurement
Tell us about your site: our engineer will agree scope and price.