Home / Services / Relay protection
Services · BakuRelay protection and automation testing
Relay protection testing confirms that protection will operate on time and without error during a fault. We test overcurrent and instantaneous overcurrent protection and perform setting and commissioning tests.

When you need it
- Commissioning a new substation or switchgear
- Periodic technical inspections
- False or delayed tripping
- Changes in equipment or load
- After a failure
Technical details
- Method
- GOST IEC 60255-151-2014
- Tested
- overcurrent and instantaneous overcurrent protection
- Measured
- pickup current (A), time (s)
- Range
- up to 1 kV (inspection scope)
- Accreditation
- AZS ISO/IEC 17025:2020, AZS ISO/IEC 17020:2021
How we do it
Relay protection and automation testing
01
Review
The protection scheme and settings are checked.
02
Test
Current is injected into relays and breakers; pickup current and time are measured.
03
Setting
Settings are adjusted to design values.
04
Report
Results are recorded in a report.
FAQ
FAQ
Why test relay protection?
If protection fails during a fault, equipment can be seriously damaged; testing prevents this.
Which protections do you test?
Overcurrent and instantaneous overcurrent protection.
Do you do settings?
Yes: testing, setting and commissioning tests.
Do you issue a document?
Yes, a signed test report.