Request a test →

Home / Services / Insulation tests

Services · Baku

Insulation resistance testing

Insulation resistance testing shows the condition of cable and wiring insulation and the risk of short circuits, leakage current and fire. We test as an accredited laboratory and issue a report.

Insulation resistance testing — Enerji Test Servis, Baku

When you need it

  • Before energising a new line
  • To assess old wiring and cables
  • After repair and reconstruction
  • When breakers trip often or leakage is suspected
  • For facility handover and periodic inspections

Technical details

Method
GOST 3345-76
Measured
insulation resistance (MΩ)
Objects
cables, wiring, lines up to 1 kV
Result
official test report
Accreditation
AZS ISO/IEC 17025:2020, AZS ISO/IEC 17020:2021
How we do it

Insulation resistance testing

01

Preparation

Circuits are identified and safely isolated.

02

Measurement

A megohmmeter measures resistance phase–phase, phase–neutral and phase–earth.

03

Evaluation

Results are compared with normative values.

04

Report

Results for each circuit go into a signed report.

FAQ

FAQ

Why measure insulation resistance?

Damaged insulation causes short circuits, overheating and fires; testing finds this in advance.

How long does it take?

It depends on the size of the facility and number of circuits; we confirm after your request.

What document is issued?

A signed report of an accredited laboratory.

Do you test cables with high voltage?

Yes, we test cable insulation with high voltage (GOST 34834-2022).

Insulation tests — Enerji Test Servis

Request a measurement

Tell us about your site: our engineer will agree scope and price.