Oil in a transformer does two jobs: it cools the windings and acts as insulation. When the oil absorbs moisture or ages, its insulating ability drops and the transformer can fail internally. Oil testing is the cheapest check that reveals this before a failure.
- The key indicator is the oil's breakdown voltage: the kilovolt level at which it breaks down (GOST 6581-75).
- Moisture, contamination and ageing lower this voltage.
- Testing is done before energising, during periodic maintenance and after oil replacement.
Why oil is tested
Transformer oil is an insulating medium. When its quality drops, the risk of breakdown between windings or between a winding and the tank grows. Such a failure means repairing or replacing the transformer, which costs many times more than an oil test.
How breakdown voltage is measured
An oil sample is poured into a test cell with standard electrodes. A steadily rising voltage is applied and the moment of breakdown is recorded. The measurement is repeated several times and averaged. We test to the GOST 6581-75 method. The result is compared with the limit for the equipment's voltage class.
Signs the oil is deteriorating
- The oil has darkened or turned cloudy.
- There is moisture, water droplets or sediment in the oil.
- The transformer overheats at normal load.
- The gas (Buchholz) relay has operated or gas is forming.
If any of these signs appear, the oil should be tested straight away.
How a sample is taken
The sample is drawn from the transformer's bottom valve into a clean, dry container. An open container or humid air can spoil the result, so sampling is best left to a specialist: we come to the site and take the sample ourselves.
When to test
- Before the transformer is energised.
- During periodic maintenance.
- After oil replacement, filtering or topping up.
- After a long shutdown.
More: transformer oil testing service.
Transformer oil — Enerji Test Servis
FAQ
What if the breakdown voltage is low?
The oil is dried and filtered or replaced, then tested again.
Does the transformer need to be switched off?
For sampling we take the transformer's operating mode and safety rules into account, and agree the procedure with the site in advance.
When will the result be ready?
The lab test itself is quick. The report is usually issued within a few working days.
What document do you provide?
A test report from an accredited laboratory (AZS ISO/IEC 17025:2020).