A megohmmeter tests insulation at low voltage. But in a working 6–10 kV cable the insulation carries a far higher voltage, and hidden defects only show up at that level. High-voltage testing exists to find those defects before a failure, under controlled conditions.
- The test applies a voltage above the operating level for a set time.
- If the insulation withstands it, the equipment is fit for service. If it breaks down, the defect has been found before a failure.
- Tests are done on new cables, after repairs and at periodic inspections. The result is recorded in a test report.
Why a megohmmeter is not enough
A megohmmeter shows insulation resistance, not dielectric strength. A poorly made joint, a micro-crack or moisture may not show at low voltage. At operating voltage, such a defect grows over time and leads to failure.
What equipment is tested
- 6–35 kV power cables and joints.
- Switchgear, circuit breakers and busbars.
- Transformer windings and bushings.
- Insulators and protective equipment (dielectric gloves, hot sticks).
How the test is done
- The equipment is disconnected, earthed and first checked with a megohmmeter.
- The test set is connected and the voltage is raised gradually to the specified level.
- The voltage is held for the time set by the standard while leakage current is monitored.
- The voltage is reduced, the equipment discharged and re-tested with a megohmmeter.
The test voltage and duration depend on the equipment type, insulation and voltage class, and are set by the standards.
VLF testing of XLPE cables
Modern cables use cross-linked polyethylene (XLPE) insulation. Testing them with high DC voltage is not recommended because it leaves a charge in the insulation. Instead, very-low-frequency AC (VLF, usually 0.1 Hz) is used: it is closer to operating conditions and does not damage the insulation.
Result and report
If the insulation withstands the test voltage and leakage current is within limits, the equipment is declared fit for service. The report lists the test voltage, duration, leakage current and conclusion. Our high-voltage tests are carried out by a laboratory accredited to AZS ISO/IEC 17025:2020.
High-voltage tests — Enerji Test Servis
FAQ
Can the test damage a cable?
Not healthy insulation: the test voltage is chosen with its strength margin in mind. If insulation breaks down during the test, it would have failed soon anyway.
How long does a test take?
Usually 1–2 hours per cable line, including preparation.
What if the cable breaks down?
We locate the fault, a joint is installed and the cable is tested again.
When is the test mandatory?
Before new cables and equipment go into service, after repairs and at periodic inspections set by the operating rules.