Relay protection testing: when and how

Enerji Test Servis · Updated:

Relay protection disconnects the faulty section during a fault. If it trips late, the fault spreads and fire risk grows. If it trips in the wrong place, the whole site goes dark for nothing. Testing shows exactly how the protection behaves.

Quick answer
  • The test measures pickup current (A) and trip time (s) and compares them with the design settings.
  • The goal is selectivity: the device nearest the fault should trip, not the whole site.
  • Testing is done at commissioning, periodically and whenever protection misbehaves.

What is tested

  • Overcurrent protection: time-delayed tripping on overload.
  • Instantaneous protection: immediate tripping on short circuit.
  • Circuit breaker characteristics: at what current and how fast they trip.

What selectivity means

Protective devices are arranged in series: incoming breaker, distribution boards, final circuits. During a fault, only the faulty circuit's device should trip. If settings are wrong, the incoming breaker trips first and the whole building loses power. Testing measures pickup current and trip time at every level and confirms selectivity.

How the test is done

  1. The protection scheme and settings are checked against the design.
  2. A test set injects current into the relay or breaker.
  3. Pickup current and trip time are measured.
  4. If needed, settings are adjusted to the design values.
  5. Results are recorded in a report.

We work to GOST IEC 60255-151-2014, on installations up to 1 kV.

When to test

  • When a new substation or switchboard is commissioned.
  • At periodic inspections.
  • When protection trips late, wrongly or for no reason.
  • When load or equipment changes.
  • After a fault.

More: relay protection testing service.

Need this service?

Relay protection — Enerji Test Servis

Learn more →

FAQ

Do you test circuit breakers too?

Yes, we also check breaker trip characteristics.

Will the power be switched off?

The device under test is taken out of service. We plan the work around the site's schedule.

Do you change the settings?

If needed, we adjust them to the design values and record the changes in the report.

What document do you provide?

A test report from an accredited laboratory.